Ok...let me try this again...I don't know if 'A' configuration will work, but thought I would ask. I think 'B' configuration will work. I used the diagram from Fasteddy's AusChristmasLighting_101_Manual_Rev1. Great manual!!
Thanks Kane.
Dang.....I thought I read somewhere you could use a crossover cable. I already have the USB dongle with the two CTB16PCs. So I would just connect those as I did last year and run a separate network switch for the ECG-P12R? Not sure how to configure the sequencing software to...
Looking for suggestions or if there is a better way to do this.
[attachimg=1]
Controller:ECG-P12R
http://www.j1sys.com/ecg-p12r/
I have a small area to work with and the viewing distance to the tree will be between 2 and 8 meters. I plan on cutting these strips in half to make a 2.5...