A country twinkle

scamper

Dedicated elf
Joined
Jan 5, 2014
Messages
1,225
Location
collie
Lenny said:
Looks like I've more work ahead of me. Just had 8 sections of 6metre pvc dropped off by my mate who works at reece plumbing along with 24 T pieces. Marty fans and arches in the build for tonight and tomorrow night. 6 of them in total

Go Nuts... 8)
I just had to rewire 8 strands on Bunnings lights and connect them to trees, add a toy factory sign, and build an extension on the house with a large window, so the wife can set up her train set and all of her xmas memorabilia... All because the wife has now come out of hibernation and has been infected with the CLAP. :-[

At least I don't get the questions about money any more :D
 

Lenny

New elf
Joined
Oct 4, 2014
Messages
38
Location
Parkes 2870
You guys probably noticed the extra models that i'd made but still unsure if I'm going to use them. I'm thinking 2 mega's will be too much. The one that is in place is correct to scale 8.5 total height. Im undecided if will do a tree topper considering I will the 5 layer star on the roof.
 
Top