Beacy
It's so much better on the dark side
All December was hampered by the intermittent lagging and freezing whilst running in scheduler. I have tried changing computer and running off an i5 with a SSD but with no noticeable difference.
What I was running = 33,030 channels this included about 7,000 x 2801 pixel nodes and 2,500 x 2811 strip.
I have tried both older and the latest versions of scheduler and had the same result
I do not use transitions and use Nutcracker for the tree only - 2,400 nodes,
The size of the LSP files range from 16.1mb to 28.3mb
Would be interest in any suggestions or experiences that other have had with this issue or how to work past it next year as the display is supposed to grow but it cant till this issue is sorted
What I was running = 33,030 channels this included about 7,000 x 2801 pixel nodes and 2,500 x 2811 strip.
I have tried both older and the latest versions of scheduler and had the same result
I do not use transitions and use Nutcracker for the tree only - 2,400 nodes,
The size of the LSP files range from 16.1mb to 28.3mb
Would be interest in any suggestions or experiences that other have had with this issue or how to work past it next year as the display is supposed to grow but it cant till this issue is sorted