Christmas on Clarafield
Full time elf

So I'm finally upgrading to the WS2811 5v pixels (that have been sitting around for the last few years) and just trying to decide how to wire up and power all the strings.
So the blue lines will be bullet nodes. The top roof line is a total of 23.1m and almost 500 pixels
The purple star is a 174 node snowflake
I will be using a HE123 Mk23 Controller with HE123 RX receivers (1 of these will most likely control the roof)
Where should I place the controller and power?
Should I have the controller to either the left or Right (right preferred) or would it be better somewhere in the middle to shorten the PI runs?