In the absence of an account on the falcon christmas forum, I hope someone here has the knowledge to point me in the right direction.
I understand that it should be possible to control fpp (slave, v7.4) from xschedule (master, v2023.23).
I can't find any correct documentation that tells me which settings I need to make.
I can upload the show file to fpp from xlights, but I cannot get xschedule to start the show file on fpp.
Can someone help me with this?
thank you in advance.