Knock knock, it's September... October... November! What are you making and are you ready for Christmas 2026?

Getting there. Still to go: mega tree, coro reindeer and presents, dumb ropelight motifs and old AC lights outside plus inside static window decorations.

Setup progress 2026

Unexpectedly my show computer (old desktop) has recently been turning itself off randomly, but replacing its PSU seems to have fixed that issue. Better to happen now rather than during December!
 
6 meter megatree went up this morning, still have to wire it in, tomorrows job.
Installed a traffic light for a bit of a difference, waiting on a relay board to arrive to control it with buttons that visitors can press/interact with. Currently it is on a relay board with a built in ESP32 running WLED.
Got the railway signal installed and running ready to go.
Bubble columns out and filled with water
I seem to be running out of multi boards again this year...
 
Last week of Nov is my usual annual leave week to concentrate on display setup and testing. Up until last week I was not planning any changes or updates but have now decided to add interactivity by adding some push buttons and allowing visitors to light up selected props or parts thereof briefly for 8 seconds in the selected button colour. Already tested on the bench that the rest of the show will continue uninterrupted.
 
ast week of Nov is my usual annual leave week to concentrate on display setup and testing.
Yep same here. I did, however, get my matrix panels finished for the solar, and thanks to help from @Kent, I've been making some clips to hold them on. There will be some minor re-arrangement of some props now with the new solid colourbond fence on the southern boundary, and trimming of the hedge (which needs to be done again, it's got full size leaves back on it after only a few weeks)
 
UPDATE!!!!
Been working hard between exams lately to get everything up and running i have 4 control boxes made and mounted and most props installed and power inject with most having the ability to go 100% brightness on full white as i love bright lights.. here are all the props i have up at the moment more coming this afternoon and into the weekend as not even a quarter of the stuff i have is up. GULP. Everything that is up i have fully tested with a running show and its awesome im really loving this hobby hopefully the first year finishes of smooth, had plenty of issues to overcome so far.
Model Name
Boscoyo LLS 46
Candy Cane Large 1
Candy Cane Large 2
Candy Cane Mini 1
Candy Cane Mini 2
Candy Cane Mini 3
Candy Cane Mini 4
GE Ginger Mouse Female
GE Upright Singing Bulb-3
Gutter
IC Candy Cane 100 Node Left Hook V1
IC Candy Cane 100 Node Left Hook V2
IC Candy Cane 100 Node Left Hook V3
IC Candy Cane 100 Node Left Hook V4
Mega Tree
Mini Tree 1
Mini Tree 10
Mini Tree 2
Mini Tree 3
Mini Tree 4
Mini Tree 5
Mini Tree 6
Mini Tree 7
Mini Tree 8
Mini Tree 9
Moving Head 1
Moving Head 2
Moving Head 3
Moving Head 4
Pixel Pole 1
Pixel Pole 10
Pixel Pole 2
Pixel Pole 3
Pixel Pole 4
Pixel Pole 5
Pixel Pole 6
Pixel Pole 7
Pixel Pole 8
Pixel Pole 9
Poly Line
Roof Left A1
Roof Left B1
Roof Right A2
Roof Right B2
Singing Bulb 2
Singing Bulb 3
Singing Tree
Snowflake 1
Snowflake 2
Snowflake 3
Window Frame
Window Matrix 1
Window Outline 2
 
Back
Top