multiple layouts and sequences on the one display

Juddge

Full time elf
Generous elf
Joined
Oct 15, 2023
Messages
176
Location
Glenmore Park - Penrith Area
ok, so my display is a bit diffirent, i have 2 sides to my house the side yard and the front yard

the side yard will be a walk through display with archway lights, displays, projectors, blowups, etc

now i am using a DC-2-24 and ws2811dc2-30 do conntrol most of it and will possibly be adding Baldrick switches to control all the non DC lights, and blowups

now i have diffirent layouts setup one for the side yard with 2 channel DC lights on xlights and will prob add the switch controls to that layout too, but what i want to know is, if i make a sequence for the side yard, and want to front yard to be to music every half hour and a generic display until show time

can i have them both on the one player ?

what i want to achieve

the side yard will be a static sequnce just changin the DC lights and keeping the Inflatables and floods to the cutouts going

now when the front yard show starts every 1/2 mins

i want to know can i tell the side yard static display to run a modified version of its sequences that will be the same but with all brightness to about 10% so the sids yard doesnt over shaddow the main front yard during musical sequences


currently using all FPP based controllers,

i want the side yard to run just 1 basic sequence all the time, but when the musical fornt yard is set to run, i want the side yard to run a dimmed version of the same sequence


then when the musical show stops, go back to normal



the front yard will be a basic sequence, until every 1/2 hr then it will run 1 musical sequence, then stop and go back to the basic sequence until the next show time


can i do all this from 1 player or from xscheduele . or do i need a player for each section as currently i use my main pc to layout and program the front yard and i have a NUC that has xlights and it has the layout and sequences for the side yard display


i would prefer to only use 1 player / schedueler -if possible
 
Back
Top